This page anchors the Phase 3 multi-site roster conversation — a single provider across the two highest-trust WA mining regions, mobilised from the Perth (Yangebup) depot and the Kalgoorlie office. Crew supply covers security, emergency-services and WHS, plus the four heavy-equipment machine classes (dump truck, excavator, dozer, drill) drawn from the broader /operators discipline set. Anonymised placements referenced below are published in full on /case-studies; the regional scope of this page is the Goldfields and Pilbara subset. Site-specific roster inquiries route into the same /contact RFQ funnel used across all divisions.
Production haul-truck operators for iron-ore load-and-haul cycles. Verifiable cycle-time experience and documented pre-start compliance.
Hydraulic mining shovel and bulk earthworks excavator operators. Ticketed, inducted, and rotation-ready for iron-ore, gold, and lithium.
Production dozer operators for push-up, bench prep, rehabilitation and clean-up fleets. GPS-aware and competent on final trim work.
Production blast hole drilling, reverse-circulation (RC) and down-the-hole (DTH) surface rigs, plus exploration support across resource definitions.
Site-ready WHS Officers and ESOs mobilised from the Kalgoorlie office for a planned plant shutdown — Day 1 start, full inductions pre-completed.
Continuous FIFO rotation of Security Personnel and Access Control staff across a remote iron-ore operation, 2/1 roster maintained without coverage gaps.
HSE Advisors and First Aid Officers placed into a regional roster vacancy, single point of contact across the full engagement.
WHS Officers + ESOs — regional roster + shutdown fill.
WHS + Drive-in / Drive-out residential roster.
WHS + mobile workforce support across the northern Goldfields.
Security + WHS + ongoing FIFO rotation.
Security + WHS + Access Control — Hamersley Range operations.
Security + Access Control + ad-hoc FIFO fills.
Security + MesO + closure-crew fill for port-side operations.
Multi-site RFQ — Goldfields, Pilbara or both. Speak with Marcus Rader about roster configuration, mobilisation timing, and the contracted single-provider posture.
Submit a Regional Roster RFQ