Planned Shutdown Crews

Planned-shutdown crew hire for tier-1 Western Australian mine operations.

Shutdown Season

Planned Shutdowns — Single-Provider Crews

Western Australian tier-1 mine shutdowns concentrate security, MESO, WHS, equipment operators and trades into a tightly sequenced rotation that leaves no room for fragmented contractors. RaderX delivers all four disciplines on a single accountable contract — one payroll, one induction pack, one mobilisation lead — staged from the Perth (Yangebup) and Kalgoorlie depots into the Goldfields and Pilbara as priority mobilisation zones. Shutdown RFQs route through the existing /contact form and are triaged alongside other divisions.

Roles Covered

Four discipline groups on one accountable contract.

Role 01

Shutdown Security

Crowd: Gatehouse Crowd: Perimeter Crowd: Escort

Gatehouse access control, perimeter patrols during high-traffic mobilisation windows, and supervised escort of contractors and equipment into active work fronts.

Role 02

MESO

Crowd: ESOs Crowd: Paramedics Crowd: Site Nurses

Emergency Services Officers, certified paramedics, and site nurses rotating through high-density shutdown windows — staged on shift with site medical protocols pre-briefed.

Role 03

WHS

Crowd: Advisors Crowd: Senior Leads Coverage: 24/7

Workplace Health & Safety advisors and senior leads embedded into the shutdown work fronts, including permit oversight, incident triage, and ICAM / Lead Investigator experience on close-out.

Role 04

Trades & Operators

Crowd: Fitters Crowd: Diesel Mechanics Crowd: HV / Operators

Mechanical fitters, diesel mechanics, heavy-vehicle (HV) drivers, and production operators (dozer / excavator / dump truck / RT) deployed into planned maintenance and capital-work scopes.

Credentials

Ticket mix routinely held for planned-shutdown deployments.

Credential Categories

The RaderX shutdown roster carries the same verified, site-ready credential posture as the existing security, ESO, and WHS engagements — verification completed before mobilisation, with copies held on the worker file for audit. Tickets routinely held across shutdown deployments include:

Coverage

Priority Mobilisation Zones — Goldfields & Pilbara first.

Mobilisation is staged from the Perth (Yangebup) and Kalgoorlie offices. The Goldfields and Pilbara are the prioritised mobilisation zones for planned-shutdown deployments — short-notice FIFO fills, large-scale rotation fills, and regional shutdown engagements deployed first into these regions. The Mid West and Kimberley form the secondary coverage tier and are supported on the same accountable model.

Discuss your next planned shutdown with the director.

Speak with Marcus Rader about scope, roster configuration, mobilisation timeline, and shutdown-window readiness.

Submit a Shutdown RFQ